GLOBAL ECONOMIC INDICATORS
Source | ||
---|---|---|
Discount rate |
N/A%
|
|
Inflation |
-0,7%
|
|
HIPC |
No
|
|
Exchange rate |
1,329
|
GDP growth (%) | -0,4 | Population (inhabitants) | 2.118.679 |
---|---|---|---|
Rural Pop. (inhabitants) | N/A | Urban Pop. (inhabitants) | N/A |
Employement rate (%) | 33,26% | HDI | 0,884 |
Population below poverty line (%) | N/A | Distribution of family income – Gini index: | N/A |
GDP (USD) | 40.323 mill € | GDP per capita (USD/pers) | 19.806 € |
Body | |
---|---|
ECREEE PV system promotes era of green energy in Cape Verde |
The first private grid-connected renewable energy household system has been commissioned under the new renewable energy law of Cape Verde. |
GHI (daily average)
Meses | kWh/m2/d | Source | ||||||
---|---|---|---|---|---|---|---|---|
Gran Canaria
|
Fuerteventura | Lanzarote | Tenerife | El Hierro | La Gomera | La Palma | ||
Enero |
3,2
|
3,6 | 3,4 | 3,3 | 2,7 | 3,7 | 2,7 | |
Febrero |
3,9
|
4,8 | 4,2 | 4,6 | 3,5 | 4,5 | 3,4 | |
Marzo | 5,1 | 6,0 | 5,4 | 5,8 | 4,8 | 5,5 | 4,7 | |
Abril |
5,4
|
6,8 | 6,2 | 5,8 | 4,9 | 6,4 | 5,1 | |
Mayo |
6,0
|
7,5 | 7,1 | 6,9 | 5,5 | 7,0 | 5,9 | |
Junio | 6,1 | 7,8 | 7,6 | 7,2 | 5,5 | 7,7 | 6,2 | |
Julio | 5,5 | 7,3 | 7,4 | 7,0 | 5,4 | 7,4 | 6,7 | |
Agosto | 5,5 | 6,9 | 6,9 | 5,6 | 5,3 | 6,8 | 6,0 | |
Septiembre | 5,1 | 6,2 | 5,8 | 5,3 | 4,7 | 6,0 | 4,6 | |
Octubre | 4,3 | 4,8 | 4,6 | 4,1 | 3,6 | 4,8 | 3,6 | |
Noviembre | 3,3 | 3,8 | 3,4 | 3,1 | 2,8 | 3,7 | 2,6 | |
Diciembre | 2,9 | 3,3 | 2,9 | 2,9 | 2,5 | 3,2 | 2,4 | |
Mean Anual GH | 4,7 | 5,7 | 5,4 | 5,1 | 4,3 | 5,6 | 4,5 |
Source: Sostenibilidad Energética de la Edificación en Canarias – Manual de Diseño (2011). Instituto Tecnológico de Canarias.
Solar Map of Canary Islands |
SOLAR PV ONGRID CAPACITY
Source | ||
---|---|---|
Solar PV Installed Capacity |
177.056,86 KW.p
|
|
Solar PV Energy production |
254.393 MWh
|
SOLAR PV ONGRID ENERGY GENERATORS
Annual Energy Production | Capacity | Status | |
---|---|---|---|
Gran Canaria | 55.163 MWh | 39.010,68MW | Operational |
Tenerife | 172.439 MWh | 113.101,42MW | Operational |
Lanzarote | 6.039 MWh | 7.664,83 MW | Operational |
Fuerteventura | 14.492 MWh | 12.706,45MW | Operational |
La Palma | 6.187 MWh | 4.530,47MW | Operational |
La Gomera | 16 MWh | 9,24MW | Operational |
El Hierro | 58 MWh | 33,77MW | Operational |
Total en Canarias | 254.393 MWh | 177.056,86MWh |
Source: Anuario Energético de Canarias 2012 – Consejería de Empleo, Industria y Comercio
SOLAR PV OFF GRID CAPACITY
Source | ||
---|---|---|
Solar PV Off Grid Installed Capacity |
569,39 MW
|
|
Solar PV (Off Grid) Energy production |
N/A MWh
|
Source: Anuario Energético de Canarias 2012 – Consejería de Empleo, Industria y Comercio
SOLAR PV OFFGRID ENERGY GENERATORS
Gran Canaria |
118,81 MW-p |
Tenerife |
179,08 MW-p |
Lanzarote |
150,46 MW-p |
Fuerteventura |
54,45 MW-p |
La Palma |
34,32 MW-p |
La Gomera |
18,33 MW-p |
El Hierro |
13,95 MW-p |
Total en Canarias |
569,39 MW-p |
Nota: sólo se incluyen las instalaciones aisladas de red con subvención por parte de la Dirección General de Industria y Energía del Gobierno de Canarias.
Source: Anuario Energético de Canarias 2012 – Consejería de Empleo, Industria y Comercio
Map of Solar PV for Canary Islands |
WIND SPEED
Primavera |
Verano |
Otoño |
Invierno |
|
Velocidad (m/s) |
1.903 |
9.87 |
15.1 |
6.94 |
Weibull C (m/s) |
8.85 |
1.91 |
13.31 |
4.81 |
Weibull K |
8.89 |
11.41 |
2.545 |
7.43 |
Distribución de la velocidad del viento por dirección a 80 m de altura.
Dirección |
Frecuencia (%) |
Velocidad (m/s) |
Potencia (%) |
Weibull C (m/s) |
Weibull K |
N |
43.39 |
10.431 |
62 |
11.312 |
2.601 |
NNE |
28.18 |
9.074 |
24.78 |
9.68 |
2.685 |
NE |
5.59 |
6.107 |
1.58 |
6.453 |
2.361 |
ENE |
2.16 |
3.837 |
0.2 |
4.287 |
2.095 |
E |
1.3 |
3.567 |
0.12 |
3.968 |
1.724 |
ESE |
1.13 |
2.436 |
0.03 |
2.645 |
2.047 |
SE |
1.3 |
2.975 |
0.05 |
3.161 |
2.227 |
SSE |
1.4 |
3.445 |
0.1 |
3.827 |
1.935 |
S |
1.68 |
3.567 |
0.11 |
3.724 |
1.894 |
SSW |
1.63 |
4.454 |
0.24 |
4.793 |
1.871 |
SW |
1.83 |
6.412 |
0.9 |
6.979 |
1.728 |
WSW |
2.36 |
6.447 |
0.83 |
6.557 |
1.96 |
W |
0.96 |
4.776 |
0.18 |
5.037 |
1.75 |
WNW |
0.35 |
2.479 |
0.01 |
2.795 |
1.756 |
NW |
0.64 |
3.349 |
0.05 |
3.724 |
1.682 |
NNW |
6.09 |
9.065 |
8.82 |
9.99 |
1.733 |
Map of Wind Speed for Canary Islands |
WIND CAPACITY
Installed Wind Power Capacity |
146.620 MW |
Precio estimado de Mercado para parques eólicos |
48,21 €/MWh |
Wind Energy production |
362.045 MWh |
Number of wind pumping systems |
0 units |
Source: Anuario Energético de Canarias 2012 – Consejería de Empleo, Industria y Comercio
WIND ENERGY GENERATORS
Denominación |
Fabricante |
Nº |
Pot. Aerg. kW |
Pot. P.E. kW |
Pot./área (kW/m2) |
Tipo |
Municipio |
Año |
Tenerife |
|
|
|
|
|
|
|
|
Aerogenerador MADE 150 ITER |
MADE |
1 |
150 |
150 |
0,477 |
VTR |
GRANADILLA A. |
1990 |
Aerogenerador MADE 300 ITER |
MADE |
1 |
300 |
300 |
0,565 |
VTR |
GRANADILLA A. |
1992 |
P.E. ITER General |
ECOTECNIA |
1 |
150 |
1.680 |
0,401 |
VTR |
GRANADILLA A. |
1994 |
(P. Experimental – ECYRL)(1) |
VESTAS |
1 |
200 |
|
|
|
|
|
P.E. Granadilla |
MADE |
8 |
600 |
4.800 |
0,361 |
VTR |
GRANADILLA A. |
1997 |
P.E. Granadilla II |
ENERCON |
11 |
500 |
5.500 |
0,392 |
VTR |
GRANADILLA A. |
1998 |
P.E. Punta Teno |
MADE |
6 |
300 |
1.800 |
0,467 |
VTR |
BUENAVISTA N. |
2001 |
P.E. Finca de Mogán |
MADE |
51 |
300 |
16.500 |
0,457 |
VTR |
ARICO |
1998/2001 (2) |
P.E. Llanos de la Esquina |
GAMESA |
7 |
850 |
5.950 |
0,400 |
VTR |
ARICO |
2004 |
Total Tenerife |
|
92 |
|
36.680 |
|
|
|
|
La Palma |
|
|
|
|
|
|
|
|
P.E. Garafía – Juan Adalid |
ENERCON |
2 |
800 |
1.600 |
0,442 |
VTR |
GARAFÍA |
1994/2012(3) |
P.E. Fuencaliente |
ENERCON |
3 |
900 |
2.250 |
0,414 |
VTR |
FUENCALIENTE |
1994/2012(4) |
P.E. Aeropuerto La Palma |
MADE |
2 |
660 |
1.320 |
0,415 |
CA |
VILLA DE MAZO |
2003 |
P.E. Manchas Blancas |
IZAR BONUS |
3 |
600 |
1.800 |
0,395 |
VTR |
VILLA DE MAZO |
2003 |
Total La Palma |
|
10 |
|
6.970 |
|
|
|
|
La Gomera |
|
|
|
|
|
|
|
|
P.E. de Epina |
MADE |
2 |
180 |
360 |
0,433 |
VTR |
VALLEHERMOSO |
1996 |
Total La Gomera |
|
2 |
|
360 |
|
|
|
|
El Hierro |
|
|
|
|
|
|
|
|
P.E. Montaña San Juan |
VESTAS |
1 |
100 |
100 |
0,318 |
VTR |
VALVERDE |
1992 |
Total El Hierro |
|
1 |
|
100 |
|
|
|
|
Total Santa Cruz de Tenerife |
|
105 |
|
44.110 |
|
|
|
|
Source: Anuario Energético de Canarias 2012 – Consejería de Empleo, Industria y Comercio
(1) P.E. ITER General (P. Experimental – ECYRL): inicialmente disponía también de un aerogenerador Cenemesa vertical de 300 kW. (2) P.E. Finca de Mogán: se instaló una 1ª fase de 10.500kW en 1998 y una 2ª fase de 6.000kW en 2001. (3) Repotenciación del parque eólico de 1.260 kW a 1.600 kW. Se sustituyen los aerogeneradores (7 Made de 180kW) por 2 Enercon de 800 kW. (4) Repotenciación del parque eólico de 1.500 kW a 2.250 kW. Se sustituyen los aerogeneradores (5 Made de 300kW) por 3 Enercon de 900 kW (con limitador).
Denominación |
Fabricante |
Nº |
Pot. Aerg. kW |
Pot. P.E. kW |
Pot./área (kW/m2) |
Tipo |
Municipio |
Año |
Gran Canaria |
|
|
|
|
|
|
|
|
P.E. Arinaga – GC01 |
VESTAS |
4 |
90 |
360 |
0,324 |
VTR |
AGÜIMES |
1990 |
P.E. Arinaga Depuradora (1) |
VESTAS |
1 |
200 |
200 |
0,407 |
VTR |
AGÜIMES |
1991 |
Aerogenerador Fábrica ACSA |
VESTAS |
1 |
225 |
225 |
0,393 |
VTR |
AGÜIMES |
1992 |
Aerogenerador Pozo Piletas |
VESTAS |
1 |
225 |
225 |
0,393 |
VTR |
AGÜIMES |
1992 |
P.E. Artes Gráficas del Atlántico |
VESTAS |
4 |
225 |
900 |
0,393 |
CA |
AGÜIMES |
1998/2002(2) |
P.E. Lomo El Cabezo |
ENERCON |
3 |
600 |
1.800 |
0,470 |
VTR |
AGÜIMES |
1999 |
P.E. Montaña Francisco – Fase I |
VESTAS |
5 |
225 |
1.125 |
0,393 |
VTR |
AGÜIMES |
2001 |
P.E. La Florida-Soslaires Canarias |
GAMESA |
4 |
660 |
2.500 |
0,380 |
CA |
AGÜIMES |
2002 |
P.E. Carretera de Arinaga |
ENERCON |
1 |
2.000 |
6.920 |
0,429 |
VTR |
AGÜIMES |
2002/2012(3) |
|
MADE |
7/1 |
660/300 |
|
|
|
|
|
P.E. Concasur |
IZAR BONUS |
1 |
600 |
600 |
0,395 |
CA |
AGÜIMES |
2004 |
P.E. Pesban, Arinaga |
GAMESA |
1 |
850 |
800 |
0,377 |
CA |
AGÜIMES |
2005 |
P.E. Seinco, Arinaga |
VESTAS |
1 |
100 |
100 |
0,318 |
CA |
AGÜIMES |
2008 |
P.E. Tenefé |
VESTAS |
5 |
225 |
1.125 |
0,393 |
VTR |
SANTA LUCÍA |
1992 |
P.E. Santa Lucía |
MADE |
16 |
300 |
4.800 |
0,467 |
VTR |
SANTA LUCÍA |
1998 |
P.E. Bahía de Formas II |
ENERCON |
4 |
600 |
2.00 |
0,392 |
VTR |
SANTA LUCÍA |
1998 |
P.E. ITCTenefé (CIEA) |
ENERCON |
2 |
230 |
460 |
0,356 |
VTR |
SANTA LUCÍA |
1998 |
P.E. Bahía de Formas III |
ENERCON |
10 |
600 |
5.000 |
0,392 |
VTR |
SANTA LUCÍA |
2000 |
P.E. Bahía de Formas IV |
ENERCON |
10 |
600 |
5.000 |
0,392 |
VTR |
SANTA LUCÍA |
2000 |
P.E. La Punta |
ENERCON |
11 |
500 |
5.500 |
0,392 |
VTR |
SANTA LUCÍA |
2000 |
P.E. La Gaviota |
ECOTECNIA |
11 |
630 |
6.930 |
0,414 |
VTR |
SANTA LUCÍA |
2001 |
P.E. Finca San Antonio |
MADE |
5 |
300 |
1.500 |
0,467 |
VTR |
SANTA LUCÍA |
1999 |
P.E. Barranco Tirajana |
MADE |
7 |
180 |
1.260 |
0,433 |
VTR |
S.B. TIRAJANA |
1994 |
P.E. Llanos de Juan Grande |
DESA |
67 |
300 |
20.100 |
0,424 |
VTR |
S.B. TIRAJANA |
1996 |
P.E. Las Salinas del Matorral |
GAMESA |
3 |
850 |
2.550 |
0,400 |
CA |
S.B. TIRAJANA |
2008/2012(4) |
P.E. La Florida – Juliano Bonny |
GAMESA |
1 |
850 |
850 |
0,400 |
CA |
S.B. TIRAJANA |
2011 |
P.E. Aguatona |
VESTAS |
2 |
100 |
200 |
0,318 |
VTR |
INGENIO |
1992 |
P.E. Lomo Ramírez-Muescanarias |
ENERCON |
1 |
330 |
330 |
0,377 |
CA |
INGENIO |
2008 |
P.E. C. de Control Canarias AENA |
MADE |
1 |
660 |
660 |
0,397 |
CA |
TELDE |
2003 |
P.E. Montaña Pelada |
MADE |
7 |
660 |
4.620 |
0,397 |
CA |
GALDAR |
2001 |
P.E. Cueva Blanca |
MADE |
4 |
330 |
1.320 |
0,467 |
VTR |
AGAETE |
1997 |
Aerogenerador La Aldea |
VESTAS |
1 |
225 |
225 |
0,393 |
VTR |
LA ALDEA DE SN |
1996 |
Total Gran Canaria |
|
205 |
|
80.640 |
|
|
|
|
Denominación |
Fabricante |
Nº |
Pot. Aerg. kW |
Pot. P.E. kW |
Pot./área (kW/m2) |
Tipo |
Municipio |
Año |
Lanzarote |
|
|
|
|
|
|
|
|
P.E. Montaña la Mina |
VESTAS |
5 |
225 |
1.125 |
0,393 |
VTR |
S. BARTOLOMÉ |
1992 |
P.E. Los Valles I y II |
GAMESA |
9 |
850 |
7.650 |
0,400 |
VTR |
TEGUISE |
1993/2006 (5) |
Total Lanzarote |
|
14 |
|
8.775 |
|
|
|
|
Fuerteventura |
|
|
|
|
|
|
|
|
P.E. Cañada de la Barca |
VESTAS |
5 |
225 |
1.125 |
0,393 |
VTR |
PÁJARA |
1992 |
P.E. Cañada del Río |
MADE |
18/27 |
300/180 |
10.260 |
0,450 |
VTR |
PÁJARA |
1994 |
P.E. Planta Desaladora CAAF |
GAMESA |
2 |
850 |
1.700 |
0,400 |
CA |
LA OLIVA |
2011 |
Total Lanzarote |
|
52 |
|
13.085 |
|
|
|
|
Total LAS PALMAS |
|
271 |
|
102.500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total CANARIAS |
|
376 |
|
146.610 |
|
|
|
|
Source: Anuario Energético de Canarias 2012 – Consejería de Empleo, Industria y Comercio
(1) Inicialmente existían en funcionamiento 2 aerogeneradores, uno de 200 kW y otro de 300 kW. (2) Inicialmente existían 2 aerogeneradores. En 2002 hubo una ampliación del parque eólico instalándose dos aerogeneradores más. (3) Sustitución de dos aerogeneradores Made de 300 kW y un aerogenerador Made de 660 kW por un aerogenerador Enercon de 2.000 KW manteniendo el resto de aerogeneradores existentes. Repotenciación del parque de 6.180 a 6.920 kW. (4) Se instala un aerogenerador Gamesa de 850 kW. Repotenciación del parque de 1.700 kW a 2.550 kW. (5) Se instaló en 1993 con un total de potencia instalada de 5.280 kW. En 2006 se llevó a cabo una repotenciación quedando una potencia de 7.650 kW.
SMALL HYDRO POWER RESOURCE
Number of Identified Potential SHP Plants |
3 units |
Identified SHP Capacity |
2.020 kW |
SHP Technical Potential |
1.791,3 MWh |
Source: Anuario Energético de Canarias 2012 – Consejería de Empleo, Industria y Comercio
SMALL HYDRO POWER CAPACITY
SHP Installed Capacity |
0 MW |
SHP Energy Production |
0 MWh |
Source: Anuario Energético de Canarias 2012 – Consejería de Empleo, Industria y Comercio
SMALL HYDRO POWER ENERGY GENERATORS
Denominación |
|
Tenerife |
|
Vergara – La Guancha |
463 kW |
Altos de Icod – El Reventón |
757 kW |
Total Tenerife |
1.220 kW |
La Palma |
|
El Mulato (parada desde el 2004) |
800 kW |
Total Canarias |
2.020 kW |
Source: Anuario Energético de Canarias 2012 – Consejería de Empleo, Industria y Comercio
BIONERGY RESOURCE
Potencia MW |
Producción (MWh) |
Horas equivalentes |
Factor de capacidad (%) |
Tep ahorrados |
CO2 evitado (t) |
|
Biogás de Vertedero |
1,6 |
7.654 |
4.784 |
54,6 |
658,2 |
6.016 |
Source: Anuario Energético de Canarias 2012 – Consejería de Empleo, Industria y Comercio
BIOENERGY CAPACITY
Bioenergy Installed Capacity |
1,6 MW |
|
Bioenergy Electricity Purchase Price |
»10 (c€/kWh) |
Tarifa regulada para instalaciones con P> 500 kW |
Bio-energy Production |
7.654 MWh |
|
Source: Anuario Energético de Canarias 2012 – Consejería de Empleo, Industria y Comercio
BIOENERGY ENERGY GENERATORS
Tenerife |
|
Complejo Medioambiental de Arico |
1,6 MW |
Source: Anuario Energético de Canarias 2012 – Consejería de Empleo, Industria y Comercio
BIOFUELS RESOURCE
BIOFUELS CAPACITY
Biofuels Installed Capacity |
0 MW |
Average price of biodiesel |
»0,804 €/l |
Biofuel production |
0 Litre |
BIOFUEL ENERGY GENERATORS
CONVENTIONAL CAPACITY INSTALLED AND ELECTRICITY PRODUCTION
Fuentes de Energía primaria |
Gran Canaria |
Tenerife |
Lanzarote |
Fuerteventura |
La Palma |
La Gomera |
El Hierro |
Canarias |
Productos derivados del petróleo |
|
|
|
|
|
|
|
|
Centrales Térmicas |
1.033,8 |
1.051,1 |
213,9 |
187,0 |
105,3 |
22,9 |
13,0 |
2.626,9 |
Refinería |
- |
25,9 |
- |
- |
- |
- |
- |
25,9 |
Cogeneración |
24,9 |
39,2 |
- |
- |
- |
- |
|
64,1 |
Total product. Derivados del petróleo |
1.058,6 |
1.116,2 |
213,9 |
187,0 |
105,3 |
22,9 |
13,0 |
2.716,9 |
|
|
|
|
|
|
|
|
|
Fuentes Renovables |
|
|
|
|
|
|
|
|
Eólica (*) |
80,7 |
36,7 |
8,8 |
13,1 |
7,0 |
0,4 |
0,1 |
146,6 |
Fotovoltaica (*) |
39,0 |
113,1 |
7,7 |
12,7 |
4,5 |
0,01 |
0,03 |
177,1 |
Minihidráulica |
- |
1,2 |
- |
- |
0,8 |
- |
- |
2,0 |
Biogás de vertedero |
- |
1,6 |
- |
- |
- |
- |
- |
1,6 |
Total Fuentes Renovables |
119,7 |
152,6 |
16,4 |
25,8 |
12,3 |
0,4 |
0,1 |
327,3 |
TOTAL |
1.178,3 |
1.268,8 |
230,3 |
212,8 |
117,6 |
23,2 |
13,1 |
3.044,2 |
Valores en bornes del alternador. (*) Sólo instalaciones conectadas a red
Unidades: Megavatios (MW)
Fuente: Dirección General de Industria y Energía. Gobierno de Canarias.
CURRENT ELECTRICITY CONSUMPTION
AÑO |
Consumo Eléctrico per cápita |
|||
Canarias |
España |
|||
kWH/habt. |
Δ(%) |
kWH/habt. |
Δ(%) |
|
2007 |
4.549 |
1,4% |
6.114 |
1,7% |
2008 |
4.524 |
-0,5 |
6.063 |
-0,8% |
2009 |
4.324 |
-4,4% |
5.740 |
-5,3% |
2010 |
4.198 |
-2,9% |
5.865 |
2,2% |
2011 |
4.170 |
-0,7% |
5.729 |
-2,3% |
2012 |
4.197 |
0,7% |
5.646 |
-1,5% |
Nota: consumo de energía eléctrica en términos de energía puesta en red. Población a 1 de enero de 2012. Fuente: INE (Padrón municipal) y Red Eléctrica de España.
CURRENT ELECTRICITY CONSUMPTION BY MONTH
January | February | March | April | May | Juin | July | August | SEP | October | November | December | ANNUAL MAX | ANNUAL MIN | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
N/A MWh
|
N/A MWh
|
N/A MWh
|
N/A MWh
|
N/A MWh
|
N/A MWh
|
N/A MWh
|
N/A MWh
|
N/A MWh
|
N/A MWh
|
N/A MWh
|
N/A MWh
|
60 MWh
|
N/A MWh
|
|
Source |
(21)
|
(21)
|
(21)
|
(21)
|
(21)
|
(21)
|
(21)
|
(21)
|
(21)
|
(21)
|
(21)
|
(21)
|
(362)
|
(21)
|
ENERGY USE BY SECTOR
GWh |
(%) |
|
Comercio y servicios |
N/A |
13,5 % |
Hostelería |
N/A |
16,7 % |
Administración y otros servicios públicos |
N/A |
19,4 % |
Uso doméstico |
N/A |
38,4 % |
Agricultura, ganadería, silvicultura, caza y pesca |
N/A |
2,1% |
Otras empresas de transporte y almacenamiento |
N/A |
2,8 % |
Resto de sectores |
N/A |
7 % |
TOTAL |
8.269 |
100 % |
GENERAL COSTS
Is the electrical sector liberalized? |
Yes |
Transmission sale price |
Yes |
Distribution sale price |
Yes |
TRANSMISSIONS LINES COSTS BY VOLTAGE
Total existing transmission lines |
More than 300 kV |
200 – 300 kV |
100 – 200 kV |
50 – 100 kV |
0 – 50 kV |
|
Red de transporte de energía eléctrica (km) |
1.243 km |
0 km |
163 km |
0 km |
1.065 km |
0 km |
Red de distribución |
|
|
|
|
|
|
Tendido aéreo |
3.271 km |
|
|
|
|
|
Tendido subterráneo |
4.107 km |
|
|
|
|
|
Cost of grid extension (EUR/km) |
N/A eur/km |
N/Aeur/km |
N/Aeur/km |
N/Aeur/km |
N/Aeur/km |
N/Aeur/km |
Los mapas de la red de transporte en cada isla se pueden consultar en el siguiente enlace: |